LUMINAR // EXECUTION LAYERFIELD NOTES · SAP EWMSYSTEM LIVE · BRISBANE
Luminar/Field notes
Notes from inside the rollouts

Written from the floor, not the stage.

We publish field notes for the supply chain executive who has to sign for the outcome. Practical decision guides, framework pieces and post-mortems from inside SAP EWM rollouts in Australia and APAC. No vendor talking points, no AI-written filler. Written by Johan Bruwer, managing partner.

No. 42What SAP EWM does on the floor: a plain-language guide for operations leaders.Field note · 10 min · ExplainerRead →No. 41Choosing a warehouse system when SAP is already your ERP: the four real options, and who should help you pick.Decision guide · 11 min · SelectionRead →No. 40Hypercare when the build team is in Europe: running the first weeks eight hours apart.Field note · 9 min · Global templateRead →No. 39One template, many sites: sequencing a rollout in one country.Field note · 8 min · Global templateRead →No. 38Getting a local fix into the global template, so the next country inherits it.Field note · 8 min · Global templateRead →No. 37What a European template misses on an Australian floor: seven checks for fit-gap.Field note · 7 min · Global templateRead →No. 36Before the build team flies in: what an Australian site should ask of a global template.Field note · 8 min · Global templateRead →No. 35Who owns EWM in year two: choosing a support model before the integrator rolls off.Field note · 8 min · Health checkRead →No. 34Taking over an EWM system someone else built: what to ask for, and what to do first.Field note · 8 min · Health checkRead →No. 33Slotting and replenishment when the product mix has moved on from go-live.Field note · 8 min · Health checkRead →No. 32Exception handling the floor avoids, and what it costs every shift.Field note · 9 min · Health checkRead →No. 31Stock accuracy after go-live: where EWM inventory variances come from.Field note · 8 min · Health checkRead →No. 30When the floor cannot scan: labels, symbology and hardware on a live EWM site.Field note · 8 min · Health checkRead →No. 29What an SAP EWM health check looks at in the first week: the floor, then the system, then the people.Field note · 7 min · Health checkRead →No. 28Cutting over a live warehouse from WM to EWM: stock in the racks, trucks at the door.Field note · 9 min · WM migrationRead →No. 27Like-for-like or redesign: how far to move on a WM to EWM migration.Field note · 8 min · WM migrationRead →No. 26Migrating WM data to EWM: what the SAP tools move, and what they leave to you.Field note · 9 min · WM migrationRead →No. 25SAP WM vs EWM: what changes on the floor for operators and supervisors.Field note · 9 min · WM migrationRead →No. 24Classic WM on S/4HANA after the Compatibility Pack: what to check and what to do.Field note · 8 min · WM migrationRead →No. 23Stock Room Management or EWM: when SAP's lighter path is the right one for a WM site.Field note · 8 min · WM migrationRead →No. 22Basic or advanced EWM: what your S/4HANA licence already covers, and what tips you into the separate one.Field note · 8 min · WM migrationRead →No. 21Big bang or phased go-live for a new distribution centre: what actually decides it.Field note · 8 min · GreenfieldRead →No. 20Testing a first WMS: UAT written from the shift, not the specification.Field note · 9 min · GreenfieldRead →No. 19The team a greenfield build needs on your side: four seats the integrator cannot fill.Field note · 8 min · GreenfieldRead →No. 18Standing up SAP EWM alongside the building: two clocks, one go-live.Field note · 9 min · GreenfieldRead →No. 17Designing warehouse processes for a floor you cannot walk: running design while the site is a drawing.Field note · 10 min · GreenfieldRead →No. 16Master data for a warehouse that does not exist yet: what to create before the racking arrives.Field note · 10 min · GreenfieldRead →No. 15How long a greenfield SAP EWM build takes, what each phase is waiting on, and what stretches it.Field note · 9 min · GreenfieldRead →No. 14Embedded or decentralised EWM for a new site: how to make the call on the floor, not the diagram.Field note · 9 min · GreenfieldRead →No. 13The business case for SAP EWM: turning warehouse execution into P&L.Field note · 10 min · Business caseRead →No. 12What an SAP EWM rollout really costs, and where the money actually goes.Field note · 10 min · CostRead →No. 11SAP WM end of life: what the 2025, 2026 and 2027 dates mean for your warehouse.Field note · 10 min · MigrationRead →No. 10Inventory management is not a WMS: why a billion dollars of stock still is not a warehouse system.Field note · 9 min · WMSRead →No. 09Labour drift: reading the six-month signals that your EWM rollout is quietly regressing.Field note · 10 min · MetricsRead →No. 08Global template, local floor: adopting a group SAP EWM template without breaking your operation.Field note · 12 min · TemplateRead →No. 07Cutover weekend: the runbook decisions that decide whether Monday works.Field note · 13 min · CutoverRead →No. 06The RF flow is the product: designing warehouse screens your operators do not fight.Field note · 11 min · DesignRead →No. 05Readiness is not training: what operational readiness actually means at go-live minus four weeks.Decision guide · 12 min · ReadinessRead →No. 04Hypercare done early: the post go-live mistakes that show up six months later as labour drift.Field note · 10 min · HypercareRead →No. 03Z code is an arrogance tax: when standard SAP EWM is the right answer and how to tell.Field note · 12 min · StandardRead →No. 02System vs Reality: the four moments in a rollout where operators quietly stop using the system.Field note · 11 min · RealityRead →No. 01How to interview an SAP EWM integrator: the questions that separate floor people from slide people.Decision guide · 14 min · Pre-RFPRead →
Subscribe to field notes

Short notes from inside the rollouts, every few weeks.

No drip campaign, no webinar replays, no “recently we sat down with”. Two minutes of reading at a time, written by a practitioner.

Skip the reading

Put a senior voice on your floor.

The field notes are free. So is the Floor Audit: one day on site, a plain-language memo in five working days, no proposal attached.