On 13 October 2026, SAP said subscriptions to its ECC transition option may run to 31 December 2035. The date is real. The conditions are narrow: SAP's private cloud on HANA by the end of 2030, at least 2 TB per system, the Max Success Plan on top, and a price that rises the later you sign. This five-page guide shows whether the longer road reaches your warehouse.
FormatPDF, five A4 pagesWritten byJohan Bruwer, Managing PartnerForCIOs, Basis leads, supply chain execsCurrent as at11 November 2026
InsideSeven sections, five pages
01What changedThe 13 October line, and what it doesn't changep. 2
02The six gatesEach SAP condition, with the question to ask your teamp. 2
03What waiting costsThe three price bands, and the one closing on 31 Decp. 3
04Which clock your warehouse is onEvery date from 2025 to 2035 in one tablep. 3
05What the option means on the floorThe 2030 cutover, and two moves or onep. 4
06Ten questions for this weekFor your Basis lead and SAP account teamp. 4
07The next 90 daysWhat to settle before the route is lockedp. 5
The 2035 headline travelled fast, and it is already being read as "ECC is safe until 2035". It isn't. The transition option is a cloud subscription, open only to ECC that has first moved onto SAP's private cloud, and SAP built it for its largest and most complex customers. Every gate below comes from SAP's own announcement.
Move first: ECC on SAP ERP, private edition, on SAP HANA before 31 December 2030.
HANA only: it is the only supported database.
Size: each system subscribed to the option must be at least 2 TB.
Coverage: products outside the option need a mitigation plan, listed in SAP Note 3591251.
Max Success Plan: required from 2031 to 2033, at a fee on top of the option.
The 2035 conditions: SAP says the run to 2035 carries further prerequisites, also in SAP Note 3591251.
Miss one and your dates are still 2027 and 2030. Clear all six and the warehouse still lands on Stock Room Management or EWM at the end. The guide puts each gate next to the question to ask your team, then covers what waiting costs and what the extra years mean for the floor that has to keep shipping through two migrations instead of one.
We aren't licensing advisers, and the commercial terms stay between you and SAP. The guide is about what each path means for the people running your warehouse.
Free · PDF · five pages
Get the 2035 check.
Name, company and work email. Download it straight away, and a copy lands in your inbox.
Rather talk it through?
Put the warehouse in the room.
Thirty minutes, no slide deck, a candid read on what the 2035 option means for your floor. Or a complimentary Floor Audit: one day on site, a plain-language memo in five working days, no proposal.
START HERE
Get the 2035 check.Five pages. PDF. Straight to your inbox.